-
On April 26, 2025, RAKHIMOV BOTIRJON, Chief Executive Officer of the Uzbekistan Branch of Shijiazhuang Tianya Electric Co., Ltd., and his delegation visited the headquarters of Shijiazhuang Tianya Electric Co., Ltd.
Apr. 28, 2025
-
Difference Between Power Transformer and Distribution Transformer
Power transformers have a voltage rating of more than 1 kV and can withstand short circuit currents up to a few hundred amperes. In comparison, distribution transformers have a voltage rating of less than 1 kV and can withstand short circuit currents up to tens of amperes.
Apr. 07, 2025
-
What Is The Purpose Of Power Transformer?
The purpose of a power transformer is to convert voltage from a high voltage (transmission line) to a low voltage (consumer). The transformer is an electrical device that transfers electric energy by electromagnetic induction.
Apr. 07, 2025
-
The Structure of Oil-immersed Power Transformer
Oil-immersed power transformer is an indispensable and important equipment in the power system, its structure is complex and precise, and the components work together to ensure the conversion of voltage and the safe transmission of electric energy.
Jan. 26, 2025
-
Tianya Electric is on 24-hour alert and ready for action with power grid failure caused by Bebinca
At around 7:30 on the 16th, "Bebinca" made landfall in Lingang New City, with a maximum wind of 14 (42 m/s) near the center of the landfall, becoming the strongest typhoon to land in Shanghai since 1949.
Jan. 26, 2025
-
TIANYA Electric - Is Ready to Contribute to The Construction of a New Power System of China
Recently, the NDRC(National Development and Reform Commission), the National Energy Administration, and the National Data Bureau issued the notice on Accelerating the Construction of a New Power System Action Plan (2024-2027) (hereinafter referred to as the Action Plan).
Jan. 24, 2025
-
New transformer technology for efficient energy transmission
According to the information released by TEPCO on July 16, the seventh round of treated radioactive water discharged from the Fukushima No. 1 nuclear power plant has been completed at noon on the same day. A total of 7,846 tons of treated radioactive water have been discharged since June 28.
Jan. 14, 2025
-
How to judge the faults of dry type transformer?
Dry type transformer has no noise during its normal operation, but sometimes it will occur loud noise. It can determine whether the dry transformer is broken down or not by the noise. Generally speaking, if the sound of the transformer is abnormal, it shows that the transformer has a fault and needs to be repaired.
Jan. 13, 2025
-
From July 4th to 6th, the 2024 China (Hebei) Smart Power and Electrical Equipment Technology Exhibition, sponsored by Shijiazhuang Low Carbon Economy Development Association and undertaken by Fujian Zhilianhui Exhibition Co., LTD., was successfully held in Shijiazhuang, Hebei.
Jan. 12, 2025